For Architects
Technical support at the stage where it still shapes the drawing.
Steel decisions influence structure, threshold and elevation rhythm. Introduced early, they are inexpensive; introduced late, they are compromises. We work to the former.
Engagement
How we work alongside a design team.
- 01
Schematic design
Feasibility of sightline intent, opening sizes and system family. Early identification of structural head conditions and threshold implications.
- 02
Design development
Profile selection, glass make-up review, finish direction and coordination with adjacent construction. Preliminary opening schedule.
- 03
Construction documents
Specification language, typical details, performance criteria per assembly, and drawing review against the intended system.
- 04
Fabrication and installation
Shop drawing review, sequencing coordination with the builder, and site support at critical stages of installation.
What we provide
Documentation written for specification, not for marketing.
- Sightline and proportion review against your elevations
- System comparison for a specific opening condition
- Specification section structure and terminology
- Typical head, jamb, sill and threshold details
- Performance criteria appropriate to the exposure
- CAD and BIM content on request
- Finish and coating guidance for the environment
- Landmark and historic review documentation support

What to send
Enough to begin, not everything at once.
- Plans and elevations at the current stage
- Opening schedule if one exists
- Project location, construction type and stage
- Any known performance or review requirements


