For Architects

Technical support at the stage where it still shapes the drawing.

Steel decisions influence structure, threshold and elevation rhythm. Introduced early, they are inexpensive; introduced late, they are compromises. We work to the former.

Engagement

How we work alongside a design team.

  1. 01

    Schematic design

    Feasibility of sightline intent, opening sizes and system family. Early identification of structural head conditions and threshold implications.

  2. 02

    Design development

    Profile selection, glass make-up review, finish direction and coordination with adjacent construction. Preliminary opening schedule.

  3. 03

    Construction documents

    Specification language, typical details, performance criteria per assembly, and drawing review against the intended system.

  4. 04

    Fabrication and installation

    Shop drawing review, sequencing coordination with the builder, and site support at critical stages of installation.

What we provide

Documentation written for specification, not for marketing.

  • Sightline and proportion review against your elevations
  • System comparison for a specific opening condition
  • Specification section structure and terminology
  • Typical head, jamb, sill and threshold details
  • Performance criteria appropriate to the exposure
  • CAD and BIM content on request
  • Finish and coating guidance for the environment
  • Landmark and historic review documentation support
Detail of steel profile section showing glazing bead, thermal separation and corner joint
Profile section — the dimension that governs the elevation

What to send

Enough to begin, not everything at once.

  • Plans and elevations at the current stage
  • Opening schedule if one exists
  • Project location, construction type and stage
  • Any known performance or review requirements